Accessory Dwelling Unit

Evana

San Rafael, CA

A 330 sq ft modular ADU designed, manufactured, and delivered by Origin Studio for a property in San Rafael, California — from contract to site installation.

Project Details

Client
Lionel Shaw

Unit Model
Evana

Agreement Date
January 2026
Location
San Rafael, CA 94901
 
Jurisdiction
City of San Rafael
CA-HCD Factory-Built
 
Delivery
March 2026
330

Square foot

1
Story
V-B
Construction Type
7
CEC Climate Zone
$70K
A modular ADU delivered from Indiana to the heart of Marin County

Lionel Shaw came to Origin Studio looking to add a compact, high-quality accessory dwelling unit to his San Rafael property. The project required navigating California’s stringent factory-built housing regulations, WUI fire-zone material requirements, and Marin County’s site conditions — all while delivering a refined, livable space within a modest footprint.

Origin Studio designed and manufactured the Evana unit at our Bloomington, Indiana facility, then coordinated delivery and site installation in San Rafael — a fully turnkey process from design through placement.

Origin Studio managed the entire process — design, permitting coordination, manufacturing, and delivery — so Lionel could focus on his property while we handled the complexity of California’s factory-built housing pathway.

The Challenge

San Rafael sits within a Wildland-Urban Interface (WUI) fire zone, which imposed strict material requirements on all exterior surfaces. The project also required full HCD (California Department of Housing and Community Development) plan approval as a factory-built structure — a process that demands meticulous code compliance across multiple California codes simultaneously.

Our Approach

Origin Studio assembled a coordinated team of specialists — structural engineering, Title 24 energy compliance, and CALGreen inspection — to ensure the unit was fully approvable under CA-HCD and ready for local site inspection in San Rafael.

Technical details at a glance

Unit Model

Evana

Square Footage

333.42 sq ft

Occupancy

R-3 Residential

Construction Typet

Type V-B

Stories

1

CEC Climate Zone

Zone 7

Approval Pathway

CA-HCD Factory-Built Housing

HCD Insignian

Inside Electrical Panel

WUI Designation

WUI Fire Zone — CRC R337 Compliant

Exterior Windows

Pella Lifestyle Series (casement, awning, fixed)

Siding

Teak V-Groove + Standing Seam Metal

HVAC

Ductless Mini-Split System

Countertops

Quartz

Flooring

Luxury Vinyl Plank

Manufacturer

Origin Studio LLC, Bloomington, IN

From agreement to installation

Every Origin Studio project follows a structured pathway that keeps clients informed and eliminates surprises — especially important when navigating California’s factory-built housing approval process.

1.
Design & Agreement

Client selects unit model and specifications. Origin Studio executes a purchase and sale agreement with defined payment milestones, timeline, and scope. Design approval agencies are engaged.

2.
Permitting & Engineering Coordination

Origin Studio coordinates structural engineering, Title 24 energy compliance, and CALGreen inspection. Full CA-HCD factory-built plan set is produced for state approval.

3.
Factory Manufacturing

The unit is built in our controlled Indiana facility — rough structure, MEP systems, enclosure, and finish trades — ensuring consistent quality regardless of site conditions.

4.
Logistics & Delivery

The completed unit is trucked from Indiana to the site. For the Shaw project, the unit was showcased at the Hayes Mansion in San Jose before final delivery to 277 Union St, San Rafael.

5.
Site Installation

The local contractor (Concrete Warriors Co.) handles foundation work and site utilities. Origin Studio coordinates to ensure the modular unit seats correctly and passes local inspection.

6.
HERS Verification & Close-Out

A certified HERS rater verifies IAQ ventilation, kitchen range hood airflow, and heat pump performance per Title 24. All close-out documentation is assembled for the client.

Fully code-compliant across every California standard

One of the greatest challenges of ADU work in California is the overlapping web of state and local codes. Origin Studio’s factory-built housing pathway means the unit is reviewed and approved at the state level, simplifying local permitting and giving clients confidence from day one.

Efficiency Credits Achieved

2022 California Residential Code (CRC)

2022 California Mechanical Code

2022 California Plumbing Code

2022 California Electrical Code

2022 California Green Building Standards (CALGreen)

2022 California Energy Code — Title 24

CA Health & Safety Code Division 13, Part 6 (Factory-Built Housing)

2022 California Fire Code (IFC)

City of San Rafael Municipal Code

WUI Fire Area — CRC R337 Exterior Materials

Here’s how
it turned out.

The specialists
on this project

Design Professional

Brian English
Origin Studio LLC

Structural Engineer

Praveen Dass
CA Licensed Civil Engineer No. 7420
Costa Mesa, CA

Energy

Nadia Pichko, M.Arch
Energy Consult LLC

CALGreen Inspector

Gary Welch
ICC Certified CALGreen Inspector
Cal Green Energy Services Inc.

Ready to add an ADU
to your property?

Origin Studio handles design, manufacturing, permitting coordination, and delivery — a single partner for the entire process.

Thanks!
Your request has been received

Our team is reviewing your project details and will get back to you shortly.

What happens next

• We review your property and project details
• A specialist will reach out within 1–2 business days
• We’ll guide you through feasibility, options, and next steps

In the meantime

Explore how our studios are designed and built.

Want to move faster?

Schedule a call directly with our team.

Schedule a consultation

Get a Tailored Quote for Your Origin Studio

This website uses cookies

We use cookies to personalize content, provide social media features, and analyze our traffic. We also share information about your use of our site with our analytics partners. You can change your preferences at any time. For more information, please see our Privacy Policy. Privacy Policy